Maximizing CO₂ Storage and Oil Recovery in Colombia’s Middle Magdalena Valley
Unlocking Recovery in a Mature Colombian Field with Intermittent Cyclic Steam Injection
Reshaping Reservoir Economics with ShaleIQ
Brownfield Waterflood Design & Optimization
Improving Oil Recovery in the Mature La Cira Infantas Oilfield using iSegwell Advanced Wellbore Modelling & CMOST Optimization Tools
CRC uses Simulation to Improve Economics in Bakersfield Thermal Project
CEPSA Evaluates Application of Foam Injection to Mature WAG Field
Vedanta Ltd. uses Simulation to Develop the World’s Largest Polymer Flood
